Harvest of the year 2021
Funded by the Kuwait Society for Relief under the slogan “Kuwait is by your side” and by the implementation of the YKF
Al-Rowa field rehabilitation project
1,101,000 beneficiaries
269,927 K.D
The poject includes
- The cornstone has been laid for the third stage
- Signing a protocol with the Minister of Water and Environment
- Coordination meeting with the governor of Abyan
- Opening of the third phase of the project
- Rehabilitation of the main station building
- Establishing and equipping the maintenance department
- Transfer station of 10 MVA
- Establishment and furnishing of the administration room
- Rehabilitation and maintenance of 10 wells in the field
- Training and qualification of human staff
project interventions
1- Wells rehabilitation
Supply and installation of hydraulic equipment and accessories for 19 wells, maintenance and replacement of operating panels for pumps for each well
2- Providing wells with engines and pumps in proportion to the productivity of each well separately for 19 wells
3- Filtering and cleaning all 19 wells in the field with compressed air and removing the dense trees that began approaching to touch the high pressure around the sites of the wells and around the electricity poles
Pumping line work
Maintenance and rehabilitation of the 57 km water transmission line to Aden Governorate
Civil works
1- Removing the dense trees inside and around the station building, as well as making lighting around the fence
2- Restoration and rehabilitation of pumping equipment rooms for 19 wells by scraping, painting, re-installing the doors and making lighting inside and outside the well rooms
3- Rehabilitation of the main station building, consisting of a hangar with an area of 450 square meters, containing generators, and a control room with 5 switches, an integrated battery unit, a maintenance room, administrative offices, and toilets.
4- Establishment of the administration room inside the station wall with preparation and furnishing
The work of establishing and equipping the maintenance department
It includes the supply of training kits, electrical kits, mechanical kits, welding kits, and motorcycles for the maintenance team to move between wells and other materials for the purpose of establishing the maintenance and training department.
Training and qualification:
Training of the human cadre at the station
Number of beneficiaries: 1,101,000
Aljamhouri Hospital Water Project
20,000 beneficiaries
40,907 KWD
Implementation of a water network for buildings in the region of Sheba
5000 beneficiaries
3, 395 KWD
Shaqra Water Rehabilitation Project
12,000 beneficiaries
26,099 KWD
Providing drinking water to the affected areas and camps
53,816 beneficiaries
26, 185 KWD
Project to distribute 6000 food baskets
39,583 beneficiaries
145,177 KWD
A project to distribute shelter bags for displaced and affected families
Rehabilitation and restoration of the school of the late Muhammad Abadi
832 beneficiaries
360,162 SAR
Rehabilitation and restoration project of Al-Kibsi School
1,406 beneficiaries
360,162 SAR
Rehabilitation, restoration and maintenance of Khadija School for Girls
600 beneficiaries
259,188 SAR
Rehabilitation and restoration of Al-Qadisiyah School
935 beneficiaries
458,605 SAR
Completion of stalled projects in the health sector
330,000 beneficiaries
18,133 USD